Skip to product information
1 of 4

Vesgantti

Vesgantti Foldable Mattress 10CM Small Single Folding Memory Foam Mattress

Vesgantti Foldable Mattress 10CM Small Single Folding Memory Foam Mattress

SKU:B0BQMJ7RT4

Regular price £93.50 GBP
Regular price Sale price £93.50 GBP
Sale Sold out
Taxes included. Shipping calculated at checkout.

Low stock: 2 left

Quantity

Vesgantti Foldable Mattress 10CM Small Single Folding Memory Foam Mattress

【Multifunctional Design】Vesgantti tri-fold mattress is the ideal solution for temporary sleeping accommodation. When not used for sleep, it can be folded into a sofa position, which is very suitable for reading or playing games. Whether it is for guests staying, camping, traveling, yoga, and video gaming, Vesgantti folding mattress is your ideal choice

【Portable & Easy to Store】The mattress can be folded into a compact shape in seconds for space-saving when not in use and it can be easily stored in the trunk of your car or under your bed. We also provide you a durable storage bag so you can keep the mattress neat and secure during storage and transport

【Superior Support & Comfort】Made of premium CertiPUR-US Certified foam, this mattress features a 2-Layer design that includes 3cm gel-infused memory foam and 7cm high-density base foam. The gel memory foam can effectively relieve your body pressure, and give you a cooling and cloud-like sleep experience; The high density support foam gives your body perfect support from head to toe

【Breathable & Washable Cover】The breathable cover is made of skin-friendly knitted fabric, which can absorb sweat and dry quickly, keeping cool after you sleep for a long time. The non-slip cloth at the bottom can prevent sliding during use. Coming with the smooth zipper, the cover of our tri-fold mattress can be quickly removed for easy washing

【Mattress in a Box】Vesgantti folding mattress is compressed rolled, and you can easily move it and set it up in your room. It will inflate right after unpacking but please allow 24-48 hours for it to fully expand (Memory foam will expand faster in a warmer room. If you are not satisfied for any reason, please do not hesitate to let us know

View full details