Skip to product information
1 of 6

‎Vesgantti

Vesgantti 3FT Single Mattress, 11 Inch Pocket Sprung Mattress Single with Breathable Foam and Individually Pocket Spring - Medium, Luxury Box Top Collection

Vesgantti 3FT Single Mattress, 11 Inch Pocket Sprung Mattress Single with Breathable Foam and Individually Pocket Spring - Medium, Luxury Box Top Collection

SKU:B07DWW46Z7

Regular price £171.13 GBP
Regular price Sale price £171.13 GBP
Sale Sold out
Taxes included. Shipping calculated at checkout.

Low stock: 2 left

Quantity
  • 【28cm Box Top Mattress】- Luxurious Button-Tufted Fabric cover with 2.5cm Egg-Shaped Foam perfectly contours to your body, absorbs noise and vibration, allows for superior airflow, and massages your pressure points for ultimate restfulness
  • 【Medium to Firm Mattress】- Designed with layers of CertiPUR-US certified foam and hundreds of individual pocket springs, Vesgantti 90 x 190 mattress has a comfortable softness, yet it's firm enough to provide optimal support. An ultra-quiet hybrid mattress for side, back, and stomach sleepers
  • 【Smart 9-Zone Mattress】- Divided into 9 ergonomic zones for healthy spinal alignment and full-body relief. It fits your body curve perfectly, providing better support and pressure relief. The combination of the spring support system and memory foam creates a comfortable sleep experience
  • 【Mattress-in-a-Box】- For your convenience, Vesgantti mattress is compressed rolled, and you can easily move it and set it up in your room. Our mattress is suited for kids beds, bunk beds, spare rooms, guest beds, lofts, apartments
  • 【100-Nights Trial】- Sleep preferences vary from person to person, so we recommend that you sleep on our vesgantti mattress for a period of time to determine if the mattress is suitable for you. The mattress comes with a 100-Nights Trial and a 10-Year warranty. Just take your time, relax, and enjoy your sleep with Vesgantti
  • View full details